Description: The City of Bend invites sealed bids for construction services to replace the Programmable Logic Controller (PLC) at Outback Well 3. The PLC replacement is to take place concurrently with improvements to Outback Well 3 under a separate contract. The open ITB lists an optional pre-bid conference on October 29, 2026, and a bid deadline of November 17, 2026, at 2:00 p.m. PST.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The City of Bend invites sealed bids for construction services to replace the Programmable Logic Controller (PLC) at Outback Well 3. The PLC replacement is to take place concurrently with improvements to Outback Well 3 under a separate contract. The open ITB lists an optional pre-bid conference on October 29, 2026, and a bid deadline of November 17, 2026, at 2:00 p.m. PST.
The City of Beaumont is seeking bids for rehabilitation of Loeb Well No. 3 and replacement of its pump and associated assemblies. The work includes well video inspection, chlorination, pump and motor testing, installation of a new pump assembly and related hardware, and site restoration. Attendance at a mandatory pre-bid conference on October 21, 2026 is required, and bids are due October 29, 2026 at 2:00 p.m. CT.
Work includes well video inspection, chlorination of well, well and pump performance test, supply and install new well pump including, supply and install new 12" x 3-1/2" x 2-3/16" column assembly,
The City of Beaumont is seeking bids for rehabilitation of Loeb Well No. 3 and replacement of its pump and associated assemblies. The work includes well video inspection, chlorination, pump and motor testing, installation of a new pump assembly and related hardware, and site restoration. Attendance at a mandatory pre-bid conference on October 21, 2026 is required, and bids are due October 29, 2026 at 2:00 p.m. CT.
Key Contacts on this RFP
Decision makers connected to this RFP from City of Bend.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
476 days before RFP
The adopted budget records an active Outback Facility Plan in the planning phase for FY2024-25 through FY2025-26 with an estimated cost of $619,000.
See sourceHide source
1WOFP Outback Facility Plan Primary Fund: Water Project Manager: Ramsey Krieps Project Status: Active Project Phase: Planning Cost Estimate Classification: 4 Est. Start Date: FY2024-25 Est. End Date: FY2025-26 Description & Background The purpose of this project is to engage the professional services of a consultant to develop and evaluate a comprehensive…
Bend reported preparation of design and construction solicitations for the Outback pretreatment and hydro project using CMGC delivery.
See sourceHide source
so right now um from the outback facility plan we have those um kind of the critical or uh immediate improvements. Um we're looking at uh just under $50 million for the pre-treatment and just under 10 for the hydro. There's a lot of overlap between those two. A lot of it um on the power side has to do with like the site interconnections and updating what's…
Board meeting
7 days before RFP
The Outback Facility Plan detailed preliminary pretreatment, in-conduit hydropower and microgrid improvements.
See sourceHide source
bit to this outback facility plan and what what the long-term u approaches to addressing some of these risks. Um [clears throat] so this basically took a step forward from the outback sighting study that did the initial um proposed uh improvements and treatments and and land needs and things like that and refined that to just just almost 30%. So um it…
Bend proposed FEMA BRIC grant funding for separately pursued Outback pretreatment and hydro projects.
See sourceHide source
so right now um from the outback facility plan we have those um kind of the critical or uh immediate improvements. Um we're looking at uh just under $50 million for the pre-treatment and just under 10 for the hydro. There's a lot of overlap between those two. A lot of it um on the power side has to do with like the site interconnections and updating what's…
Bend Water Advisory Group Meeting
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.