Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Anne Arundel County Public Schools issued solicitation 26CM-194 for Packaged Terminal Air Conditioners (PTAC), equipment only (rebid). Bids are due Feb 3, 2026 at 11:00 AM (Bid Room at 2644 Riva Road, Annapolis, MD) and may be submitted electronically via the AACPS bidding portal. Solicitation documents and submission instructions must be obtained from the AACPS bidding site and questions should be directed to Marilyn Murphy (mmmurphy1@aacps.org).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contracting for Five (5) Island Aire Packaged Terminal Air Conditioner units. Each unit must include: 1) Cooling Chassis; 2) Heat Section; and 3) Digital Unit Mounted Controls.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Contracting for Five (5) Island Aire Packaged Terminal Air Conditioner units. Each unit must include: 1) Cooling Chassis; 2) Heat Section; and 3) Digital Unit Mounted Controls.
AvailableTerminal, tin plated, 4-hole, 4000amps material must match and intermember with existing department equipment: "hitachi" #245pmg63-20b "hitachi" #917c24401, 12 each.
Posted Date
Dec 1, 2025
Due Date
Jan 30, 2026
Release: Dec 1, 2025
Close: Jan 30, 2026
Terminal, tin plated, 4-hole, 4000amps material must match and intermember with existing department equipment: "hitachi" #245pmg63-20b "hitachi" #917c24401, 12 each.
AvailableTerminal 1 & Terminal 3 Traveler’s Retreat Lease. The lease will have 2 locations, the first location will be post-security in Harvey Milk Terminal 1, boarding area B, approx. 3,054 square feet (Space E.2.205) featuring private rooms and shower service as well as a food and beverage service totaling no more than 40% of the premises. The second location will be post-security in Terminal 3, boarding area E, approx. 1,300 square feet (space B.2.212) featuring private rooms and shower service.
Posted Date
Jul 3, 2025
Due Date
Feb 4, 2026
Release: Jul 3, 2025
Close: Feb 4, 2026
Terminal 1 & Terminal 3 Traveler’s Retreat Lease. The lease will have 2 locations, the first location will be post-security in Harvey Milk Terminal 1, boarding area B, approx. 3,054 square feet (Space E.2.205) featuring private rooms and shower service as well as a food and beverage service totaling no more than 40% of the premises. The second location will be post-security in Terminal 3, boarding area E, approx. 1,300 square feet (space B.2.212) featuring private rooms and shower service.
Work involve the design and construction of a new 17,800-square-foot, two-story terminal facility. The terminal will accommodate a fixed base operator (fbo), flight training school, flight simulator, and corporate offices for airport tenants. The project scope also includes associated site and terminal apron improvements, entrance roadway, and the design of a 200-space surface parking lot to support the new terminal operations.
Posted Date
Dec 3, 2025
Due Date
Feb 5, 2026
Release: Dec 3, 2025
Close: Feb 5, 2026
Work involve the design and construction of a new 17,800-square-foot, two-story terminal facility. The terminal will accommodate a fixed base operator (fbo), flight training school, flight simulator, and corporate offices for airport tenants. The project scope also includes associated site and terminal apron improvements, entrance roadway, and the design of a 200-space surface parking lot to support the new terminal operations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis