Board meeting
162 days before RFP
The agenda attachment lists the Route C SR0090 project for acceleration from SFY 2028 to 2027, with construction totals shown as $4,503 thousand and $4,292 thousand respectively.
See 3 sourcesHide sources
Accelerations State Fiscal Year 2027 to 2031 Description SFY Previous SFY Current CN Total Previous CN Total Current Northwest Holt County, MO 118 E, Job No. NW0059 - Bridge rehabilitation over I-29 near Mound City. Project involves bridge A1766. 2028 2027 $2,101 $2,040 Linn County, US 36 W, Job No. NW0127 - Construct J-turns at the intersection with Rte.…
Missouri Highways And Transportation Commission Meeting
County: HENRY Pavement resurfacing, add rumble stripes, and upgrade guardrail at various locations from Rte. 7 to Rte. 65. Project involves bridges A3881, A3691, L0413, S0438, A3913, and A4477. Route: RT C Adv. CN: 3,865 State : 966 Local : 0 Estimated Total: 4,923 Project No.: SR0090 Anticipated Federal Funds : AC-STBG Award Date : 12/2026 Length: 17.51…
MoDOT's Southwest District Highway and Bridge Construction Schedule 2027-2031
MoDOT's construction schedule lists SR0111B for Route U resurfacing from Whiteman Road to Route 52 in Cole Camp, with anticipated AC-STBG funding, a 12/2026 award date, and a $649,000 estimated total.
See 2 sourcesHide sources
County: BENTON Pavement resurfacing from Whiteman Road to Rte. 52 in Cole Camp. Route: RT U Adv. CN: 519 State : 130 Local : 0 Estimated Total: 649 Project No.: SR0111B Anticipated Federal Funds : AC-STBG Award Date : 12/2026 Length: 5.92 Let With : SR0090 SR0313 Future Cost : 0 MPO: N Tip No. : Engineering: 0 81 0 0 0 0 R/W: 0 0 0 0 0 0 Construction: 0 568…
MoDOT's Southwest District Highway and Bridge Construction Schedule 2027-2031
MoDOT's construction schedule lists SR0313 for Route PP resurfacing from Route C near Roseland to Route 7 in Tightwad, with anticipated AC-STBG funding, a 12/2026 award date, and a $1.748 million estimated total.
See 2 sourcesHide sources
County: HENRY Pavement resurfacing from Rte. C near Roseland to Rte. 7 in Tightwad. Route: RT PP Adv. CN: 1,390 State : 348 Local : 0 Estimated Total: 1,748 Project No.: SR0313 Anticipated Federal Funds : AC-STBG Award Date : 12/2026 Length: 5.56 Let With : SR0090 SR0111B Future Cost : 0 MPO: N Tip No. : Engineering: 10 211 0 0 0 0 R/W: 0 0 0 0 0 0…
MoDOT's Southwest District Highway and Bridge Construction Schedule 2027-2031
Work includes 356 SY of 4" thick type 1 aggregate for base; 4 TN of gravel (a) or crushed stone (b); 9,353. 900 TN of asphaltic concrete mixture pg 70-22 (sp095c mix).
Work includes 16 EA of steel right of way markers; 9 AC of clearing and grubbing; 21,463 CY of class A excavation; 44,800 CY of embankment in place; 350 LF of misc. 6" force main, HDPE (DR-11) (HDD installation).
Key Contacts on this RFP
Decision makers connected to this RFP from Missouri Department of Transportation.
LWLevi WoodsAdministrator of Freight and Waterways
*******@************
+1 (***) ***-****
TLTabitha LockeArea Engineer, North St. Louis County
*******@************
+1 (***) ***-****
RPRyan PearcyArea Engineer -- South/West St. Louis County