Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1,814 CY of class A excavation; 1,193 CY of embankment in place; 366 CY of compacting embankment; 3 CY of class 3 excavation; 4,014 SY of 4" thick type 5 aggregate for base; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 53 TN of bituminous pavement mixture pg64-22, (bp-1); 49 gal. of tack coat; 84 CY of furnishing type 1 rock ditch liner; 8 EA of temporary long-term rumble strips; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 53 TN of bituminous pavement mixture pg64-22, (bp-1); 49 gal. of tack coat; 84 CY of furnishing type 1 rock ditch liner; 8 EA of temporary long-term rumble strips; see attached files.
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableWork includes 2,343 CY of class A excavation; 1,443 CY of embankment in place; 45 CY of class 3 excavation; 137 SY of 9" thick of type 1 aggregate for base; 8,446 SY of 4" thick type 5 aggregate for base; see attached files.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Work includes 2,343 CY of class A excavation; 1,443 CY of embankment in place; 45 CY of class 3 excavation; 137 SY of 9" thick of type 1 aggregate for base; 8,446 SY of 4" thick type 5 aggregate for base; see attached files.
AvailableBridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
Bridge deck wearing surface removal and replacement, deck patching, expansion joint replacement, bearing replacement, concrete repairs, HMA shoulder repairs, pavement striping, and other related construction work at two structures. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis