Summary
Work consist of resurface the entire tiled floor surfaces of the existing rotunda and connecting areas under the project generalized as follows: approx. Existing 4,524-sf tiled rotunda area shall have the ceramic tile removed and replaced with a slip-resistant durable exterior coating system, removal of existing ceramic tile and mortar, heavy grinding of substrate with dust protection measures. , installation and polishing of the specific concrete levelling base system, installation of new recessed door mats, the monumental stairs are to be removed and replaced with a short ADA ramp divided by 2 small dividers/planters with illuminated handrails. See attached file.