Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Commerce (GA) issued an RFP for Phase 2 renovation of Ridling Field to perform erosion control, slope stabilization, stormwater management, and construction of a parking lot with associated conduits, wiring, and piping. The contractor must submit site/civil and building plans, comply with ADA requirements, and provide required insurance and bonding (performance bond required for projects exceeding $100,000). The contract period is up to 180 days from notice to proceed; proposals are due January 29, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Commerce (GA) issued an RFP for Phase 2 renovation of Ridling Field to perform erosion control, slope stabilization, stormwater management, and construction of a parking lot with associated conduits, wiring, and piping. The contractor must submit site/civil and building plans, comply with ADA requirements, and provide required insurance and bonding (performance bond required for projects exceeding $100,000). The contract period is up to 180 days from notice to proceed; proposals are due January 29, 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
The City of Commerce (GA) issued an RFP for Phase 2 renovation of Ridling Field to perform erosion control, slope stabilization, stormwater management, and construction of a parking lot with associated conduits, wiring, and piping. The contractor must submit site/civil and building plans, comply with ADA requirements, and provide required insurance and bonding (performance bond required for projects exceeding $100,000). The contract period is up to 180 days from notice to proceed; proposals are due January 29, 2026.
Premium
Access the largest public sector contact database
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
Posted Date
Dec 8, 2025
Due Date
Feb 5, 2026
Release: Dec 8, 2025
Close: Feb 5, 2026
Naselle hatchery renovation phase 2 project which includes the construction of an exclusion barrier weir, river intake, juvenile resident fish ladder, river intake pump station, adult fishway, auxiliary water supply, adult collection trap, adult holding ponds, reuse pump station and other incidental work at the hatchery.
AvailableThe U.S. Department of Veterans Affairs (VA) is soliciting a design-build contractor to provide turnkey renovation services for the GI Renovation Phase III at the Brooklyn VA Medical Center, including all labor, materials, MEP, medical booms, ceiling supports, and commissioning. The work is to be completed in phases over a 365-calendar-day performance period and must comply with VA design guidelines, NFPA, Life Safety, and OSHA requirements; contractors must coordinate with Premier Engineering Group, Inc. for the Design-Build package. The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside and includes a public attachment (36C242226R0018.docx) listed on SAM.gov.
Posted Date
Nov 21, 2025
Due Date
Dec 30, 2025
Release: Nov 21, 2025
Close: Dec 30, 2025
The U.S. Department of Veterans Affairs (VA) is soliciting a design-build contractor to provide turnkey renovation services for the GI Renovation Phase III at the Brooklyn VA Medical Center, including all labor, materials, MEP, medical booms, ceiling supports, and commissioning. The work is to be completed in phases over a 365-calendar-day performance period and must comply with VA design guidelines, NFPA, Life Safety, and OSHA requirements; contractors must coordinate with Premier Engineering Group, Inc. for the Design-Build package. The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside and includes a public attachment (36C242226R0018.docx) listed on SAM.gov.
AvailableField renovation.
Posted Date
Nov 30, 2025
Due Date
Jan 6, 2026
Release: Nov 30, 2025
Close: Jan 6, 2026
Field renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis