25084-215603 - 1.47 mi of construction of noise barrier wall, concrete barrier, steel sheet piling, drilled shafts, concrete curb and gutter, drainage, and guardrail work along westbound I-69 ramp from westbound I- 69 to northbound I-475 and ramp from northbound I-475 to eastbound I-69 in the city of Flint, Genesee County. RFP
Description: 1.47 mi of construction of noise barrier wall, concrete barrier, steel sheet piling, drilled shafts, concrete curb and gutter, drainage, and guardrail work along westbound I-69 ramp from westbound I- 69 to northbound I-475 and ramp from northbound I-475 to eastbound I-69 in the city of Flint, Genesee County. This project includes a 2 year concrete surface coating warranty. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 17200 Fa ** Completion Date: 6/15/2028 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
1.47 mi of construction of noise barrier wall, concrete barrier, steel sheet piling, drilled shafts, concrete curb and gutter, drainage, and guardrail work.
The Kentucky Transportation Cabinet is seeking bids for asphalt pavement and roadway rehabilitation on I-69 in Webster County. The project spans 1.30 miles. The work includes removal and resurfacing.
Work includes 208 LF of edge key; 3,831 TN of asphalt pave milling & texturing; 16,456 LF of pave striping-thermo-6 in w; 14,628 LF of pave striping-thermo-6 in y; 13,931 LF of joint adhesive; 2,100 SF of temporary signs; 27,862 LF of edgeline rumble strips; 32,041 LF of pave striping-temp paint-6 in; 1,530 SF of concrete sealing and associated works.
INDOT seeks project development services for two intersection improvement projects on SR 332 in Delaware County, near CR 600 W and CR 300W/Morrison Road. The selected firm will provide environmental documentation, permits, public involvement, topographic surveying, road design, utility coordination, hydraulic analysis and design, right-of-way plan development, traffic management planning, and construction-phase services. Wetland mitigation, archaeological and historical investigations, and subsurface utility engineering may be added if needed; INDOT will perform pavement design, geotechnical services, right-of-way buying, and real estate closing activities.
Key Contacts on this RFP
Decision makers connected to this RFP from Michigan Department of Transportation.
JRJean RuestmanAdministrator, Office of Passenger Transportation