Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of eliminating approx 1.4 acres of acid pits with a highwall spanning 2,900 LF. The highwall and pits will be backfilled with onsite mine spoil material at slopes no steeper than 3:1 with transitions as required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Abatement plans will consist of building an access road to the portal. Tearing down the concrete structure of the mine slope opening and using that material to fill the opening. Then a 12" thick concrete pad will be poured over the material to form a permanent closure. A concrete mine monument will then be place on top of the concrete pad. An epoxy coated standing pipe with a concrete base will then be place over the existing pipe that is located near the mine portal location to continue to vent the underground mines.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Abatement plans will consist of building an access road to the portal. Tearing down the concrete structure of the mine slope opening and using that material to fill the opening. Then a 12" thick concrete pad will be poured over the material to form a permanent closure. A concrete mine monument will then be place on top of the concrete pad. An epoxy coated standing pipe with a concrete base will then be place over the existing pipe that is located near the mine portal location to continue to vent the underground mines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →