Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Louisville Water Company requests sealed bids (ITB) for Repair Couplings and Gaskets with submissions required through the Louisville Water Bonfire portal; bids are to be submitted electronically and will be publicly read via conference call. The solicitation term covers delivery requirements and insurance/compliance conditions, with potential contract renewals for up to four additional one-year terms. The solicitation is open and evaluates bids based on responsiveness, compliance, and lowest/best price.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Specifications for support clamps, plastic service tees, stab couplings and repair couplings includes, Ell, 2” P.E. 90 Degree, Qty 40 EA. Tee, 2” P.E., Qty 20. Cap, 2” P.E., Qty 150 EA. Coupling, 2” P.E., Qty 100 EA. Cap, 4” P.E., Qty 10 EA. 2” Support Clamps, Qty 125 EA. Ell, 4” P.E. 90 Degree, Qty 30 EA. 4” Support Clamps, Qty 10 EA. Coating, Pipe Roskote Package, 4-1 Gallon Cans, Qty 4 EA. TEE, 1 1/4” X 3/4” EFTT/EFV with Excess Flow Valve, Qty 10 EA. TEE, 2” X 3/4” EFTT/EFV with Excess Flow Valve, Qty 400 EA.
Posted Date
Dec 19, 2025
Due Date
Jan 13, 2026
Release: Dec 19, 2025
Close: Jan 13, 2026
Specifications for support clamps, plastic service tees, stab couplings and repair couplings includes, Ell, 2” P.E. 90 Degree, Qty 40 EA. Tee, 2” P.E., Qty 20. Cap, 2” P.E., Qty 150 EA. Coupling, 2” P.E., Qty 100 EA. Cap, 4” P.E., Qty 10 EA. 2” Support Clamps, Qty 125 EA. Ell, 4” P.E. 90 Degree, Qty 30 EA. 4” Support Clamps, Qty 10 EA. Coating, Pipe Roskote Package, 4-1 Gallon Cans, Qty 4 EA. TEE, 1 1/4” X 3/4” EFTT/EFV with Excess Flow Valve, Qty 10 EA. TEE, 2” X 3/4” EFTT/EFV with Excess Flow Valve, Qty 400 EA.
AvailableThe Massachusetts Bay Transportation Authority is soliciting bids for articulation gaskets, including Part #51209 Butt Strap, Elastomer Articulation per MBTA Drawing #51209, as well as a compression mold and first article inspection sample. Bidders must review and complete the IFB bid document and comply with MBTA’s minimum insurance requirements; MBTA may accept partial shipments and will consider delivery availability in award decisions. Standard MBTA contract terms apply and bidders must provide the required cost input form and insurance documentation.
Posted Date
-
Due Date
Dec 31, 2025
Release: -
Close: Dec 31, 2025
The Massachusetts Bay Transportation Authority is soliciting bids for articulation gaskets, including Part #51209 Butt Strap, Elastomer Articulation per MBTA Drawing #51209, as well as a compression mold and first article inspection sample. Bidders must review and complete the IFB bid document and comply with MBTA’s minimum insurance requirements; MBTA may accept partial shipments and will consider delivery availability in award decisions. Standard MBTA contract terms apply and bidders must provide the required cost input form and insurance documentation.
Provide transition couplings, 2"-14" (sms).
Posted Date
Nov 28, 2025
Due Date
Jan 2, 2026
Release: Nov 28, 2025
Close: Jan 2, 2026
Provide transition couplings, 2"-14" (sms).
AvailableThe Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
Posted Date
Aug 25, 2025
Due Date
Dec 31, 2025
Release: Aug 25, 2025
Close: Dec 31, 2025
The Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →