Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following work: the acquisition and installation of emergency bypass pumps at the city sanitary sewer pump stations spr15, spr26, and spr27.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Fairhope is requesting qualified contractors for the installation of twelve (12) new lift station bypass pumps, including preparation, construction, and installation of concrete slabs, piping, and fittings.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
The City of Fairhope is requesting qualified contractors for the installation of twelve (12) new lift station bypass pumps, including preparation, construction, and installation of concrete slabs, piping, and fittings.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for Bids for the purchase of Gaillard Bypass Pumps.
Posted Date
Jan 5, 2026
Due Date
Jan 16, 2026
Release: Jan 5, 2026
Close: Jan 16, 2026
Request for Bids for the purchase of Gaillard Bypass Pumps.
AvailableThe work consist of approx 740 LF 15" gravity PVC sanitary sewer pipe; 2 EA 60" precast concrete manholes; 480 LF 21" gravity PVC sanitary sewer pipe; 1 LS bypass pumping; 1 LS roadway repair and site restoration.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
The work consist of approx 740 LF 15" gravity PVC sanitary sewer pipe; 2 EA 60" precast concrete manholes; 480 LF 21" gravity PVC sanitary sewer pipe; 1 LS bypass pumping; 1 LS roadway repair and site restoration.
AvailableWork include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work include Cleaning, televising (pre- and post-construction), and lining 2,452 LF of existing 24" and 4,078 LF of existing 36" sanitary sewer Reinforced Concrete Pipe (RCP) with Cured in Place Pipe (CIPP); bypass pumping to facilitate the CIPP lining of the existing sanitary sewer; the construction of approx 6,460 LF of 12' wide aggregate access driveway, along with associated excavation and grading work; installation approx 1,620 LF of timber matting to cross delineated wetland area, and removal upon completion of the work; installation of 15" to 30" HDPE culvert pipe totaling approx 2,520 LF; installation of erosion and sedimentation control facilities and post construction stormwater management facilities; rehabilitation of approx 33 existing manholes; site stabilization and non-paved restoration; other minor items and appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →