Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Reroof project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Health Sciences Building Reroof Project at Spartanburg Community College involves complete replacement of a low-slope roof including deck repairs, new insulation, and a PVC/KEE membrane for approximately 25,579 sq ft. The procurement is an Invitation for Bid delivered via Design-Bid-Build with an estimated construction cost between $850,000 and $900,000. Bidders should obtain full contract documents from the official source (SCBO) and contact the project manager for questions.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The Health Sciences Building Reroof Project at Spartanburg Community College involves complete replacement of a low-slope roof including deck repairs, new insulation, and a PVC/KEE membrane for approximately 25,579 sq ft. The procurement is an Invitation for Bid delivered via Design-Bid-Build with an estimated construction cost between $850,000 and $900,000. Bidders should obtain full contract documents from the official source (SCBO) and contact the project manager for questions.
Premium
Access the largest public sector contact database
East Admin Building & East Control Center Reroof.
Posted Date
Dec 5, 2025
Due Date
Dec 31, 2025
Release: Dec 5, 2025
Close: Dec 31, 2025
East Admin Building & East Control Center Reroof.
AvailableThe Little Rock Municipal Airport Commission is soliciting bids to remove and replace the existing roof at the Airport’s 1805 Bond St. building, including roof tear off and new installation plus ancillary mechanical, plumbing, and electrical work. The project will be let under one prime contract; a Pre-response Meeting and Site Tour is scheduled for 10:00 AM local time on December 16, 2025. Responses are due at 2:00 PM local time on January 8, 2026 and the complete ITB package is posted on the airport's online bidding portal.
Posted Date
Dec 7, 2025
Due Date
Jan 8, 2026
Release: Dec 7, 2025
Close: Jan 8, 2026
The Little Rock Municipal Airport Commission is soliciting bids to remove and replace the existing roof at the Airport’s 1805 Bond St. building, including roof tear off and new installation plus ancillary mechanical, plumbing, and electrical work. The project will be let under one prime contract; a Pre-response Meeting and Site Tour is scheduled for 10:00 AM local time on December 16, 2025. Responses are due at 2:00 PM local time on January 8, 2026 and the complete ITB package is posted on the airport's online bidding portal.
AvailableMajor components of project work consist of the existing built-up roofing and PVC as removed and replaced with new 30-year warranty PVC roof system and new rigid insulation system including flashing, replacement of the existing roof drains, downspouts, gutters and new parapet flashing where required. Building to have tapered insulation with positive slope to gutters. Lead based paint and asbestos-containing materials (ACMS) have been found on the roof.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Major components of project work consist of the existing built-up roofing and PVC as removed and replaced with new 30-year warranty PVC roof system and new rigid insulation system including flashing, replacement of the existing roof drains, downspouts, gutters and new parapet flashing where required. Building to have tapered insulation with positive slope to gutters. Lead based paint and asbestos-containing materials (ACMS) have been found on the roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis