Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes, but is not limited to: removal of the existing handrail and concrete patchwork and furnishing and installing new handrails and guardrails, and removal and replacement of the existing gutters at the covered walkway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes installation of guardrail at various locations.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Work includes installation of guardrail at various locations.
AvailableProvide re-wire existing receptacles to panel d to add an equipment grounding conductor to each receptacle throughout the eagles nest buildings.
Posted Date
Dec 2, 2025
Due Date
Jan 15, 2026
Release: Dec 2, 2025
Close: Jan 15, 2026
Provide re-wire existing receptacles to panel d to add an equipment grounding conductor to each receptacle throughout the eagles nest buildings.
AvailableWork includes 737. 5 LF install new guardrail w-beam, single face, steel posts w/ 8" mondo blocks, 5 EA install new end treatment (mskt tl-2), 787. 5 LF remove and dispose of existing guardrail, 6 EA remove concrete bct post foundation, 37. 5 LF install side-mounted weak-post guardrail assembly (2'-9" posts), traffic control. See attached file.
Posted Date
Dec 13, 2025
Due Date
Jan 15, 2026
Release: Dec 13, 2025
Close: Jan 15, 2026
Work includes 737. 5 LF install new guardrail w-beam, single face, steel posts w/ 8" mondo blocks, 5 EA install new end treatment (mskt tl-2), 787. 5 LF remove and dispose of existing guardrail, 6 EA remove concrete bct post foundation, 37. 5 LF install side-mounted weak-post guardrail assembly (2'-9" posts), traffic control. See attached file.
AvailableProcurement of Technology & Modernization Services.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Procurement of Technology & Modernization Services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis