Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of two double barrel (10 ft x 10 ft reinforced concrete box culverts; aggregate surfaced approaches; and roadway embankments; including 223 Ton PGE; 1,924 SY erosion blanket; 976 ft perimeter erosion barrier; 798 Ton aggregate surf CSE B; 288 SY aggregate shoulder B 6; 1 EA rem exist structure. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procure box culvert bridge materials for modernization and repair work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Procure box culvert bridge materials for modernization and repair work.
AvailablePremium
Access the largest public sector contact database
Tannery bridge replacement and other incidental work includes common excavation, 930 CY aggregate subbase course gravel, 150 ton hot mix asphalt 12.5 MM HMA surface, saw cut grooving.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Tannery bridge replacement and other incidental work includes common excavation, 930 CY aggregate subbase course gravel, 150 ton hot mix asphalt 12.5 MM HMA surface, saw cut grooving.
AvailableBridge rehabilitation (4 Structures) and bridge deck and rail repair (1 Structure); Involving installing sheet piles, repairing bridge deck, placing structural concrete, approach slabs, asphalt pavement, and bridge deck overlay, and installing expansion joint material and guardrail.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Bridge rehabilitation (4 Structures) and bridge deck and rail repair (1 Structure); Involving installing sheet piles, repairing bridge deck, placing structural concrete, approach slabs, asphalt pavement, and bridge deck overlay, and installing expansion joint material and guardrail.
AvailableEmergency Bridge Structural & Substructure Repairs and Related Work.
Posted Date
Nov 24, 2025
Due Date
Jan 6, 2026
Release: Nov 24, 2025
Close: Jan 6, 2026
Emergency Bridge Structural & Substructure Repairs and Related Work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis