Summary
Work includes approx. clearing and grubbing; Excavation, Embankment and Grading, Incl. Haul; 100 SY of Construction Geotextile for
Underground Drainage; 40 LF of 12" CPEP Underdrain Pipe; 20 LF of 6" PVC Storm Sewer Pipe; 6 EA of catch basin; 1 EA of adjust catch basin; Erosion Control and Water Pollution Prevention; 280 SY of Seeding, Fertilizing and Mulching; 760 LF of Cement Conc. Traffic Curb and Gutter; 136 SY of Cement Concrete Driveway Entrance; 71 SY of Cement Concrete Driveway Repair; 360 SY of Cement Conc. Sidewalk; 750 LF of Paint Line; Permanent Signing; 630 LF of 8" DI Pipe for Water Main; 2 EA of Connection to Existing Water Main;