Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of the existing pipe culvert and construction of a single span precast prestressed concrete deck beam superstructure on concrete spill thru pile bent abutments, 48 ́back-to-back of abutments and 24 ́out to out of deck with no skew. The project also includes channel excavation and protection, erosion control measures, seeding, reconstruction of approx. 252 of Township Road 104 with an aggregate surface, and other related work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
Posted Date
Oct 6, 2025
Due Date
Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
Work includes clearing and grubbing, 1,946 SY removal of asphalt pavement, all depths, 2 EA removal of bridge, 670 SY removal of concrete pavement w/ variable depth overlay, 1,210 LF removal of curb & gutter, all types, 312 LF removal of gravity sewer line, all sizes, all types, 1 EA removal of gravity sewer manhole, all sizes, all types, 93 LF removal of guard rail double faced rail including rail & posts, 326 LF removal of guard rail, including rails, posts and terminal ends, 2 EA removal of and replacement of low mast lighting assembly. See attached file.
AvailableThis RFP is for the construction of 11 bridge replacements on US 80 at KCS Railroad in Rankin County.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
This RFP is for the construction of 11 bridge replacements on US 80 at KCS Railroad in Rankin County.
AvailableThe Hawaii Department of Transportation, Highways Division is soliciting construction bids to replace the Waiaka Bridge and realign approaches at Kawaihae Road, including reconstructing the existing T-intersection into a roundabout and associated pavement, drainage, utility, and traffic control work. The project is part of Federal-Aid Project No. BR-019-1(093) in the District of South Kohala on the Island of Hawaii with an estimated construction cost of about $22M–$25M. Bids are due Feb 13, 2026 and proposals must be uploaded to HIePRO prior to the posted due date/time.
Posted Date
Jan 14, 2026
Due Date
Feb 14, 2026
Release: Jan 14, 2026
Close: Feb 14, 2026
The Hawaii Department of Transportation, Highways Division is soliciting construction bids to replace the Waiaka Bridge and realign approaches at Kawaihae Road, including reconstructing the existing T-intersection into a roundabout and associated pavement, drainage, utility, and traffic control work. The project is part of Federal-Aid Project No. BR-019-1(093) in the District of South Kohala on the Island of Hawaii with an estimated construction cost of about $22M–$25M. Bids are due Feb 13, 2026 and proposals must be uploaded to HIePRO prior to the posted due date/time.
AvailableWork includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Work includes approx. 1 LS clearing and grubbing, 73,418 CY unclassified excavation, 3,400 SY solid sodding, 1,378 SY ditch liner, 68 Thousand Gallon watering, 10 AC insect pest control, 114 AC mowing, 19 AC grassing, 700 TN riprap for erosion control, 1,887 SY fine milling, 3,745 Gal asphalt for tack coat, 4 Mile rumble strips, 1,018 LF saw cut, 208 LF 24" reinforced concrete pipe, 775 LF guardrail, signage, pavement marking, 300 LF precast concrete median barrier.