Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
AvailableThe City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Release: Dec 2, 2025
Close: Dec 23, 2025
SIT - Capital CIP.
AvailableEstimate of quantities 1,160 LF of sanitary sewer w/ manholes; 1,160 LF of watermain w/ valves; 8 ea sanitary laterals & 8 ea water services; 1,340 LF of storm sewer w/ catch basins; 3,470 LF of concrete curb and gutter; 17,000 SF of concrete sidewalk/driveway; 6,700 SY of HMA pavement 5 blocks of street grading & lawn restoration.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
Estimate of quantities 1,160 LF of sanitary sewer w/ manholes; 1,160 LF of watermain w/ valves; 8 ea sanitary laterals & 8 ea water services; 1,340 LF of storm sewer w/ catch basins; 3,470 LF of concrete curb and gutter; 17,000 SF of concrete sidewalk/driveway; 6,700 SY of HMA pavement 5 blocks of street grading & lawn restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis