Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Work includes 40 CY exploratory excavation; 132 CY trench foundation; 2,130 SY trench resurfacing (6" depth); 300 LF remove & replace concrete curb & gutter ; 96 sf remove & replace concrete walk; 1 ls longitudinal pavement markings and traffic calming ; 1 ls landscape restoration; 200 LF 4" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 1,675 LF 6" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill; 2,165 LF 8" ductile iron zinc coated potable water pipe, with poly wrap encasement, zinc coated fittings and couplings with restrained joints and class b backfill. See outside link.
AvailableThe City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The City of Salinas requests Statements of Qualifications (RFQual) for professional engineering design services for the Boronda Road Congestion Relief Phase 2 project (CIP 9510), covering ~1.1 miles of East Boronda Road including multi-lane roundabouts, stormwater treatment, shared-use paths, bike lanes, bus pullouts, sidewalks, ADA ramps, utility coordination and related improvements. The procurement is a qualifications-based solicitation (RFQual); SOQs must be submitted electronically via PlanetBids by the stated due date.
Release: Dec 2, 2025
Close: Dec 23, 2025
SIT - Capital CIP.
AvailableEstimate of quantities 1,160 LF of sanitary sewer w/ manholes; 1,160 LF of watermain w/ valves; 8 ea sanitary laterals & 8 ea water services; 1,340 LF of storm sewer w/ catch basins; 3,470 LF of concrete curb and gutter; 17,000 SF of concrete sidewalk/driveway; 6,700 SY of HMA pavement 5 blocks of street grading & lawn restoration.
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
Estimate of quantities 1,160 LF of sanitary sewer w/ manholes; 1,160 LF of watermain w/ valves; 8 ea sanitary laterals & 8 ea water services; 1,340 LF of storm sewer w/ catch basins; 3,470 LF of concrete curb and gutter; 17,000 SF of concrete sidewalk/driveway; 6,700 SY of HMA pavement 5 blocks of street grading & lawn restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis