Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 812 CY earth excavation; 219 CY furnished excavation; 867 ton aggregate base course, type b; 2 EA box culverts end sections, culvert no. 1; 36 LF precast concrete box culverts 8'x5'; 76 LF pipe culverts, cl d, type 1 15"; 51 SY geocomposite wall drain; 51 SY membrane waterproofing system for buried structures; 6.1 TON bituminous materials (cover & seal coats); 39 TON cover coat aggregate; 20 TON seal coat aggregate; 0.80 acre seeding, class 2 (special).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk. See outside link.
AvailableProvide geotechnical report for WB realignment, intersection improvements.
Posted Date
Dec 23, 2025
Due Date
Jan 12, 2026
Release: Dec 23, 2025
Close: Jan 12, 2026
Provide geotechnical report for WB realignment, intersection improvements.
AvailableFor the work of rehabilitating the roadway.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
For the work of rehabilitating the roadway.
AvailableWork includes roadway markings.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
Work includes roadway markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →