CityAL
Posted
Oct 22, 2026
Nov 13, 2026
Road Resurfacing Project RFP
Work includes road resurfacing.
Description: Provide labor, equipment, supervision, and incidentals to perform tree-cutting operations within designated clearing limits for referenced properties (approx. 6.231 total acres across 2163 and 2370 Godby Road), cutting designated tree trunks to ground level and removing all cut tree material/debris off-site.
City · GA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of College Park.
Adjacent opportunities open for bidding right now.
CityAL
Posted
Oct 22, 2026
Nov 13, 2026
Work includes road resurfacing.
CityNH
Posted
Oct 3, 2026
Dec 2, 2026
Project involves the reconstruction of the intersection of Old Dover Road and Tebbetts Road to reconfigure the intersection to a mini roundabout. Principal work elements will include milling of the paved surfaces, full-depth localized widening of the intersection and its approaches, construction of a concrete infield and median islands, and installation of drainage infrastructure.
CityTX
Posted
Oct 22, 2026
Nov 5, 2026
Road rehabilitation project. Scope of work includes - remove and replace existing 7" 3,600 psi reinforced concrete pavement, complete and in place; remove and replace existing 7" 5,000 psi high-early strength reinforced concrete pavement, complete and in place; see attached file.
CityMO
Posted
Oct 19, 2026
Nov 4, 2026
Construction of a new asphalt roadway, importing fill material and associated earthwork, improvements to the chesterfield valley master plan channel, and culvert installation.