Bid Packages: No. 1: Site Preparation, Dirtwork, and Fine Grading upon Completion. No. 2: Foundation Excavations, Foundation Concrete, Building SubBase, Aggregate Base, Moisture Barrier Membrane, Floor Slab Concrete & Reinforcing, Building and Site Concrete. No. 3: Caulking and Sealants. No. 4: Pull Down Access Ladder - Materials. No. 5: General Trades, all carpentry materials and installations, framing, access ladder installation, blocking required in walls, door installations, hardware installations. No.6: Finish Carpentry & Millwork. No.7: Joint Sealant and Caulking. No.8: Hollow Metal Doors & Hollow Metal Frames - Materials. No.9 Interior Signage - Materials & Installation. No.10: Coiling Door, Sectional Overhead Door, Rolling Doors - Materials & Installations. No.11: Finish Hardware, Material. No.12: Metal Framing, Insulation, Drywall, Insulation, Ceiling. No.13: Resilient Base. No.14: Painting. No.15: Pre-engineered Metal Building, Interior Wall Panels, & Insulation - Materials. No.16: Pre-engineered Metal Building, Interior Wall Panels, & Insulation - Erection/Installation. No. 17: Batting Cages, Sliding Nets, Suspension Hardware - Materials and installations. No.18: Turf System - Labor and Materials and Installation. No. 19: Fire Protection - Materials & Installation. No. 20: Plumbing - Materials & Installations. No. 21: HVAC - Materials & Installations. No. 22: Electrical Materials & Installations.
Available