Work includes removal and disposal of existing pavement 197.500 SY, removal and disposal of existing curb 276.000 LF, removal and disposal of existing asphalt pavement 14.000 SY, removal of exist guardrail 4,195.500 LF, unclassified excavation 3,006.000 CY, borrow excavation 1,919.800 CY, station grading 107.870 sta, additional rock for full depth reclamation 2,796.000 Ton, maintenance stone 255.000 Ton, cement modified recycled base (8" unif) curing method b 20,148.000 SY, cement modified recycled base (10" unif) curing method b 36,081.000 SY, cement modified recycled base (12" unif) curing method b 46,787.000 SY. See attached file.