CityIA
Posted
-
Dec 3, 2026
2027 City of Odebolt Southeast Watermain Improvements Project
Work to Be Done: Work generally consists of approximately 6,270 linear feet of PVC C900 Water Main - Grading, Excavation, Subgrade Preparation and Modified Subbase - Storm Sewer Culvert Removal and Installation - 5” P.C. Concrete Sidewalk - 6” P.C. Concrete Pavement - Pavement Removals - Granular Surfacing - Temporary Traffic Control - Erosion Control Items
