Summary
Work consists of construction of a new waste cell including: clearing & grubbing, watering, earthwork, stockpiling bulk and select excavated materials, excavating waste cover soils, removing existing below grade piping and valves, leachate collection and onsite leachate disposal, installing below grade piping and valves, screening excavated material, mixing screened materials with bentonite and water, placing and compacting clay materials, performing conformance testing on geosynthetic materials, installing geosynthetic clay liner, installing smooth and textured geomembrane, installing composite drainage net, installing geotextile, installing on-grade piping, placing permeable materials, installing reinforced polyethylene cover, conducting an electrical leak location survey, installing culverts, placing aggregate base, and installing landfill gas extractions wells.