Retrieving RFP details
Release
Close
City of Twinsburg
2026 Waterford Pond Dredging Phase 1.
City of Frisco
Work includes but is not limited to sediment removal, temporary storage for drying, testing of removed sediment for contaminants, transportation and disposal to an applicable site while preserving water quality, water volume, and wildlife. 20000 cy dredging and sediment removal; 20000 cy dewatering & handling of sediment (including materials for leveling dewatering pad); 12 per sample sediment testing; site restoration (access, vegetation, erosion control, grading/leveling).
Port Of Grays Harbor
One round of maintenance dredging. Contractor will be required to provide water quality monitoring during operations and will be required to conform to all environmental permits issued for the project.
City of Rochester
Work includes 120 LF 2" non-metallic conduit; 40 LF 4" non-metallic conduit; 300 CY random riprap class III; 24,000 CY excavation channel and pond; 6,315 SY site restoration.
Release
Oct 28, 2025
Close
Nov 20, 2025