Replacement of select components at the water treatment plant facility. Replacement of filter media in two (2) 10-foot O.D. by 22-foot O.E. horizontal pressure filters. Replacement of all butter fly valves, actuators, and air release valves on each tank. Replacement of air solenoid panels, components, and piping. Replacement of reverse osmosis skid #1 filter membrane. Principal items of work include but are not limited to 2 Ea Horizontal Pressure Filter Media Replacement; 28 Ea 8 inch and 4 inch Butterfly Valves with Pneumatic Operators; 2 Ea Air Solenoid Panels and Tubing; 2 Ea Exterior and Interior Tank Painting; 1 Ea Reverse Osmosis Skid Membrane Replacement.
Replacement of select components at the water treatment plant facility. Replacement of filter media in two (2) 10-foot O.D. by 22-foot O.E. horizontal pressure filters. Replacement of all butter fly valves, actuators, and air release valves on each tank. Replacement of air solenoid panels, components, and piping. Replacement of reverse osmosis skid #1 filter membrane. Principal items of work include but are not limited to 2 Ea Horizontal Pressure Filter Media Replacement; 28 Ea 8 inch and 4 inch Butterfly Valves with Pneumatic Operators; 2 Ea Air Solenoid Panels and Tubing; 2 Ea Exterior and Interior Tank Painting; 1 Ea Reverse Osmosis Skid Membrane Replacement.
Project consists of emolition of two (2) existing brine tanks, two (2) existing sodium hypochlorite tanks, existing oshg system, and existing peristaltic and end-suction centrifugal pumps, as well as associated piping and appurtenances. Sandblasting and recoating in existing disinfection all building. Installation of two (2) new sodium hypochlorite storage tanks, including but not limited to piping, valves, heat tracing, instrumentation, accessories, and appurtenances. Installation of two (2) new peristaltic pump skids and one (1) new end-suction centrifugal pump, including but not limited to piping, valves, instrumentation, accessories, and appurtenances. Installation of new hvac, electrical, and instrumentation equipment in membrane building.
The Village of Northbrook is soliciting sealed bids for construction of water main improvements involving installation of approximately 320 feet of new 6-inch water main on Grace Road and Pfingsten Road. Bids were posted on 2026-04-09 and are due/close on 2026-05-07; the solicitation is a construction procurement (not a grant) and the work is subject to Illinois prevailing wage and Illinois Works requirements. The contact for the solicitation is Michael Weller, Project Manager, 847-664-4132, michael.weller@northbrook.il.us.
The Village of Northbrook is soliciting sealed bids for construction of water main improvements involving installation of approximately 320 feet of new 6-inch water main on Grace Road and Pfingsten Road. Bids were posted on 2026-04-09 and are due/close on 2026-05-07; the solicitation is a construction procurement (not a grant) and the work is subject to Illinois prevailing wage and Illinois Works requirements. The contact for the solicitation is Michael Weller, Project Manager, 847-664-4132, michael.weller@northbrook.il.us.
Replacing approx. 375 galvanized water services with new HDPE water services, consisting of approx. 200 long side connections and 180 short side connections. Meters are mostly 5/8", with the rest being split between 1" and 2" water meters. Work will also include the installation of two pressure reducing valves and associated concrete utility vaults. Straight-edge pavement cutting, pavement patching, and seeding/grassing, will be required as needed.
Replacing approx. 375 galvanized water services with new HDPE water services, consisting of approx. 200 long side connections and 180 short side connections. Meters are mostly 5/8", with the rest being split between 1" and 2" water meters. Work will also include the installation of two pressure reducing valves and associated concrete utility vaults. Straight-edge pavement cutting, pavement patching, and seeding/grassing, will be required as needed.
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Project consists of emolition of two (2) existing brine tanks, two (2) existing sodium hypochlorite tanks, existing oshg system, and existing peristaltic and end-suction centrifugal pumps, as well as associated piping and appurtenances. Sandblasting and recoating in existing disinfection all building. Installation of two (2) new sodium hypochlorite storage tanks, including but not limited to piping, valves, heat tracing, instrumentation, accessories, and appurtenances. Installation of two (2) new peristaltic pump skids and one (1) new end-suction centrifugal pump, including but not limited to piping, valves, instrumentation, accessories, and appurtenances. Installation of new hvac, electrical, and instrumentation equipment in membrane building.