Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Rifle (Colorado) issued a solicitation titled "2026 Water System Improvements" seeking contractors to perform water system improvement work at various locations. The solicitation was published on 2025-12-11 and includes a pre-bid event and technical/construction scope (surveying, utility work, roadway restoration, bonds, prevailing wage). Solicitation documents are hosted on the buyer portal and require vendor registration to download full contract documents and response instructions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The installation of 3" and 6" potable water main and related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
The installation of 3" and 6" potable water main and related appurtenances.
AvailableWork includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
Posted Date
Dec 22, 2025
Due Date
Feb 9, 2026
Release: Dec 22, 2025
Close: Feb 9, 2026
Work includes approx 7,595 LF 8" DIP class 52 with polyethylene wrap water main; 300 LF 8" DIP class 52 with polyethylene wrap water main by directional bore; 2,640 LF 1" PEX water service pipe by directional bore; 10 EA 6" PVC SDR-26 D2241 sanitary sewer service repair. See outside link.
AvailableProject consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
AvailableProvide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis