Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City-County of Butte-Silver Bow is requesting bids for the purchase of various water main materials for its 2026 Water Main Materials Replacement Projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of roughly 8,500' of cast iron pipe with 6" and 4" PVC pipe and 200' 6" fusible PVC, this scope includes 190 water service reconnections. Surface restoration includes trench asphalt patch paving, roto-milling, overlay and miscellaneous concrete repair.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Replacement of roughly 8,500' of cast iron pipe with 6" and 4" PVC pipe and 200' 6" fusible PVC, this scope includes 190 water service reconnections. Surface restoration includes trench asphalt patch paving, roto-milling, overlay and miscellaneous concrete repair.
AvailableProject consist of approx 3,307 CY of Excavation; 1,228 TON of HMA Binder course IL-19.0 N50; 16,240 SF of 5" Portland cement concrete sidewalk; 5,262 FT of Curb and gutter; 2,761 FT of 4" pavement marking. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 22, 2026
Release: Jan 8, 2026
Close: Jan 22, 2026
Project consist of approx 3,307 CY of Excavation; 1,228 TON of HMA Binder course IL-19.0 N50; 16,240 SF of 5" Portland cement concrete sidewalk; 5,262 FT of Curb and gutter; 2,761 FT of 4" pavement marking. See outside link.
AvailableProcurement of Metron water meters with Verizon cellular subscriptions for a water meter replacement project.
Posted Date
Jan 8, 2026
Due Date
Jan 21, 2026
Release: Jan 8, 2026
Close: Jan 21, 2026
Procurement of Metron water meters with Verizon cellular subscriptions for a water meter replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →