Summary
Work includes 1,400 LF of 2" Conduit, Trenchless, Directional Bore; 1,700 LF of 2" Conduit, Trenched; 12 LF of 24" RCP Storm Sewer, Trenched; 14 LF of 18" RCP Storm Sewer, Trenched; 36 LF of 15" RCP Storm Sewer, Trenched; 83 LF of 12" RCP Storm Sewer, Trenched; 200 T of Storm Sewer Excavation as Subdrain; 15 LF of 2" Type K Copper ater Service Pipe, Trenched; 276 LF of 1" Type K Copper Water Service Pipe, Trenched; 44 LF of 3/4" Type K Copper Water Service Pipe, Trenched; 5 EA of Water Service Corporation; 1 EA of 48" Storm MH, SW-401, Removal of 1,254 (SY) of sidewalk, removal of 1,788 SY of roadway pavement, installation of 1,548 SY of new sidewalk, 1,310 SY of full-depth pavement patching, and 158 SY of driveways.