Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the ‘turnkey’ removal and replacement of all site fencing and all fencing and concrete caps on existing retaining and block walls in order to accomplish the following work and goals: Remove all existing metal fencing, concrete wall caps and related flashing etc. in order to facilitate new installations. Base Bid-Option A : Remove and Replace all (approximately 235) concrete wall caps and related flashing with new precast concrete caps and cap flashing with new fence embedded into metal sleeve installed into first course of existing concrete block (see Base Bid-Option A Detail). Base Bid-Option A Alternate #1: Provide Add/Deduct price to leave all existing fencing installed directly into the ground and powder coat paint to match the rest of the new fencing assuming Base Bid-Option A is selected. Option B-Alternate #2: Provide price to remove and replace all (approximately 235) concrete wall caps and related flashing with new precast concrete caps and cap flashing with new fence installed with fence posts welded to a 5” x 5” plate to be bolted to the top of the new concrete caps. (see Option B-Alternate #2 Detail). Alternate #3: Provide Add/Deduct price to, in lieu of replacing the fencing with new fence, while maintaining the finish height of the existing fencing, cut the bottom +/- 4” – 6” of the existing fence and weld to 5” x 5” plate, per Option B. Contractor shall include in its price to also powder coat paint the modified fencing. Alternate #4: Provide Add/Deduct price to leave all existing fencing installed directly into the ground and powder coat paint to match the rest of the new fencing assuming Option B-Alternate #2 is selected. Alternate #5: Provide Add/Deduct Price to provide a color additive to the new concrete caps. (applies to Base Bid-Option A and Option B-Alternate #2). Include inspection of existing split face block retaining walls for structural deficiencies and repair as needed. All newly furnished fence to be 42” industrial grade flat top ornamental picket with 3" x minimum .125 aluminum posts secured to wall. All penetrations to be sealed with industrial grade sealant specified by manufacturer.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 concrete street repair project.
Posted Date
Jan 16, 2026
Due Date
Feb 11, 2026
Release: Jan 16, 2026
Close: Feb 11, 2026
2026 concrete street repair project.
AvailableWork includes elementary school 2026 roof replacement project.
Posted Date
Jan 18, 2026
Due Date
Feb 5, 2026
Release: Jan 18, 2026
Close: Feb 5, 2026
Work includes elementary school 2026 roof replacement project.
AvailableThe City of Sunset Hills, Missouri is seeking bids from qualified contractors for the replacement of approximately 3,386 square yards of 7-inch thick concrete slabs on streets.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
The City of Sunset Hills, Missouri is seeking bids from qualified contractors for the replacement of approximately 3,386 square yards of 7-inch thick concrete slabs on streets.
Available2026 site renovations at Helen Keller Elementary School project.
Posted Date
Jan 19, 2026
Due Date
Feb 10, 2026
Release: Jan 19, 2026
Close: Feb 10, 2026
2026 site renovations at Helen Keller Elementary School project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis