Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repairs and replacement of victaulic piping, joints and fittings. Associated work includes temporary piping, valves, fittings, insulation, controls, etc. Additional work includes demolition, general construction, fire protection, and electrical work to remove and reinstall items to allow access to the piping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Emergency hydronic piping replacement.
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
Emergency hydronic piping replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pool piping replacement project.
Posted Date
Jan 19, 2026
Due Date
Feb 26, 2026
Release: Jan 19, 2026
Close: Feb 26, 2026
Pool piping replacement project.
AvailableThe City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
The City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
AvailableJEA seeks a contractor to replace sulfuric acid and sodium hydroxide piping at the Northside Generating Station, including runs from chemical storage tanks to polishers and the demineralization building. The work specifies new materials (e.g., 1½‑inch 316 stainless steel Teflon‑lined pipe for acid and 1‑inch carbon steel with heat tracing for caustic), valves, and associated improvements, with adherence to JEA safety and construction requirements. The procurement was issued January 15, 2026, includes a mandatory site walk, and bids are due in late February 2026.
Posted Date
Jan 15, 2026
Due Date
Feb 24, 2026
Release: Jan 15, 2026
Close: Feb 24, 2026
JEA seeks a contractor to replace sulfuric acid and sodium hydroxide piping at the Northside Generating Station, including runs from chemical storage tanks to polishers and the demineralization building. The work specifies new materials (e.g., 1½‑inch 316 stainless steel Teflon‑lined pipe for acid and 1‑inch carbon steel with heat tracing for caustic), valves, and associated improvements, with adherence to JEA safety and construction requirements. The procurement was issued January 15, 2026, includes a mandatory site walk, and bids are due in late February 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →