Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 3,002 LF of Curb and Gutter Type 2(Section IIB); 1,481 SY Concrete Curb Ramp (TOP Standards); 44 SY 6" Concrete Sidewalk; 20 LF of Curb and Gutter Type 2 (Section IB).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Works include approx. 3,002 LF of Curb and Gutter Type 2(Section IIB); 1,481 SY Concrete Curb Ramp (TOP Standards); 44 SY 6" Concrete Sidewalk; 20 LF of Curb and Gutter Type 2 (Section IB).
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Works include approx. 3,002 LF of Curb and Gutter Type 2(Section IIB); 1,481 SY Concrete Curb Ramp (TOP Standards); 44 SY 6" Concrete Sidewalk; 20 LF of Curb and Gutter Type 2 (Section IB).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: -
Close: Feb 4, 2026
Provide 2026 concrete replacement for city parks.
AvailableGeneral concrete replacement: curb and gutter replacement for 2 blocks. Additional replacement of existing city of aspen sidewalk in the right of way (row)
Posted Date
Jan 20, 2026
Due Date
Mar 2, 2026
Release: Jan 20, 2026
Close: Mar 2, 2026
General concrete replacement: curb and gutter replacement for 2 blocks. Additional replacement of existing city of aspen sidewalk in the right of way (row)
AvailableBridge reconstruction including removal and replacement with prestressed concrete i-beams, cip concrete abutments and approach work.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Bridge reconstruction including removal and replacement with prestressed concrete i-beams, cip concrete abutments and approach work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →