Summary
Project provides for: The construction of infrastructure to support the future installation of aircraft docking guidance systems at eleven (11) gates located at Minneapolis-St Paul International Airport Terminal 2. Site work includes traffic control, pavement removal and replacement, installation of mounting posts and foundations, and guide post installation. Electrical work includes items to support the future equipment, but no guidance systems or installation of guidance systems are included with this project. Approximate quantities of major items of work are as follows: Item Description Quantity Unit of Measure; Concrete removal 90 SY; Bituminous removal 15 SY; Concrete Pavement 90 SY; Bituminous Pavement 6 TN Electrical Power & Connections 1 LS; Conduits 1 LS; Mounting Posts, various styles 11 EA; Guide Posts 36 EA.