Summary
Work consist of 4,150 lf of curb grind existing pavement, 885 sy of 2"- 4" spot/end grind existing pavement, 720 sy of deep base repair of failed roadway sections, includes saw cut, 16" common excavation, 12" of base rock. Hmac paid under ac overlay, 1,400 tn of 1/2" dense mix hmac pavement overlay, 2,100 lf of 4" wide white or yellow thermoplastic stripe, 2,100 lf of 8" wide white or yellow thermoplastic stripe, 180 sf of 12" wide white stop bars or 24" wide white thermoplastic crosswalk bars, 2' wide x 10' long continental crosswalk, 4 ea of bike markings, left turn arrows, straight & right turn arrows. See attached file.