Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes milling and overlay of approximately eight city blocks of HMA paved or seal-coated streets, and associated work. Approx. 50 Ton Topsoil, Furnish and Spread; 7,624 SY Pavement Milling; 180 SY Sidewalk, PCC, 6"; 223 SY PCC Patching, 6 IN; 404 LF Curb & Gutter, 2'; 190 SY 3.5" Overlay; 4,098 SY 4" Overlay; 1 EA Manhole, Sanitary, SW-301, 48"; 6 EA Minor Adjustment, Manhole; 10 SY Seeding and Mulching, Permanent. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Procurement of services for full depth reclamation of street pavement, installation of new bituminous pavement, concrete curb and gutter, and storm sewer maintenance for the 2026 Street Improvements project.
AvailableThe Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
Posted Date
Jan 12, 2026
Due Date
Feb 13, 2026
Release: Jan 12, 2026
Close: Feb 13, 2026
The Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
AvailableThe work consists of street reconstruction including asphalt removal and placement, subbase replacement, sanitary sewer repair, storm sewer installation, signage placement and other similar items.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
The work consists of street reconstruction including asphalt removal and placement, subbase replacement, sanitary sewer repair, storm sewer installation, signage placement and other similar items.
AvailableThe project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis