Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the reconstruction of streets including concrete curb and gutter, replacement of storm sewer structures and pipes, and installation of drain tile.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 27, 2026
The project includes the construction of approx. 4,200 LF of watermain along with associated water services. The project includes placing approx. 200 LF of storm sewer, approx. 23,000 SF of new sidewalk along the west side of Maple Street, an underground storm water detention system, retaining walls, and miscellaneous sanitary improvements along Maple Street. The project includes reconstructing the west lane of Maple Street, crushing & shaping the east lane, and paving with approx. 4,800 Tons of HMA, along with all associated work. This project also includes steel sheet pile seawall repairs, concrete sidewalk replacement, earthwork, concrete patching, drainage improvements, asphalt resurfacing, turf restoration, traffic controls and related work at various other locations. Lastly, the project includes a mill and fill.
AvailableStreet and utility reconstruction, consisting of: 8" Sanitary sewer (1,175 LF); 8" water main (1,500 LF); 4" and 6" Concrete (4,000 SF); Hot-Mix Asphalt (1,550 tons); Concrete Curb & Gutter (2,500 LF); Grass restoration (1,650 SY).
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Street and utility reconstruction, consisting of: 8" Sanitary sewer (1,175 LF); 8" water main (1,500 LF); 4" and 6" Concrete (4,000 SF); Hot-Mix Asphalt (1,550 tons); Concrete Curb & Gutter (2,500 LF); Grass restoration (1,650 SY).
AvailableApprox. 2,850 LF of roadway reconstruction including water utility replacement. Water utility replacement includes proposed 8" ductile iron main with all associated fittings, appurtenances, and services. Roadway reconstruction includes spot concrete curb and gutter replacement, dense graded base aggregate, and 4" asphaltic pavement. Approx. 2,275 LF of partial roadway reconstruction with storm sewer crossing replacements. Storm sewer crossing replacements include proposed RCP storm sewer and all associated structures and connections. Partial roadway reconstruction includes spot concrete curb and gutter replacement, spot base repairs, grading, and 4" asphaltic pavement. All other associated removals, erosion control, traffic control, clearing and grubbing, excavation, grading, and pavement markings.
Posted Date
Jan 7, 2026
Due Date
Feb 12, 2026
Release: Jan 7, 2026
Close: Feb 12, 2026
Approx. 2,850 LF of roadway reconstruction including water utility replacement. Water utility replacement includes proposed 8" ductile iron main with all associated fittings, appurtenances, and services. Roadway reconstruction includes spot concrete curb and gutter replacement, dense graded base aggregate, and 4" asphaltic pavement. Approx. 2,275 LF of partial roadway reconstruction with storm sewer crossing replacements. Storm sewer crossing replacements include proposed RCP storm sewer and all associated structures and connections. Partial roadway reconstruction includes spot concrete curb and gutter replacement, spot base repairs, grading, and 4" asphaltic pavement. All other associated removals, erosion control, traffic control, clearing and grubbing, excavation, grading, and pavement markings.
AvailableProject consists of installation of water main and sanitary sewer utilities utilizing trenchless construction methods. The project includes all necessary service connections, appurtenances, and associated restorations. See outside link.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Release: Jan 7, 2026
Close: Jan 29, 2026
Project consists of installation of water main and sanitary sewer utilities utilizing trenchless construction methods. The project includes all necessary service connections, appurtenances, and associated restorations. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.