Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of asphalt skip patching, bituminous paving, scratch course paving, and structure adjustment/butt joint milling services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Perform road maintenance and grading work 2026.
Posted Date
Jan 30, 2026
Due Date
Feb 13, 2026
Release: Jan 30, 2026
Close: Feb 13, 2026
Perform road maintenance and grading work 2026.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The South Heidelberg Township is soliciting bids for the 2026 Road Maintenance Projects, which include maintenance and surface treatments on seven different streets. Bidders are required to be PennDOT prequalified and must provide a proposal security equal to 10% of the total bid amount. The project work must be completed within 45 calendar days following the receipt of the Notice to Proceed.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
The South Heidelberg Township is soliciting bids for the 2026 Road Maintenance Projects, which include maintenance and surface treatments on seven different streets. Bidders are required to be PennDOT prequalified and must provide a proposal security equal to 10% of the total bid amount. The project work must be completed within 45 calendar days following the receipt of the Notice to Proceed.
AvailableProvide the necessary supervision, engineering, layout, notifications, materials, and construction of; 3/4” shim lift of DOT Spec. 9.5 mm. shim HMA mix, overlay with a 1” lift of DOT Spec. 9.5mm. surface HMA mix, place 2’ wide compacted gravel shoulder backing material entire road length at sections as needed, for all affected areas on these three roads.
Posted Date
Jan 8, 2026
Due Date
Mar 2, 2026
Release: Jan 8, 2026
Close: Mar 2, 2026
Provide the necessary supervision, engineering, layout, notifications, materials, and construction of; 3/4” shim lift of DOT Spec. 9.5 mm. shim HMA mix, overlay with a 1” lift of DOT Spec. 9.5mm. surface HMA mix, place 2’ wide compacted gravel shoulder backing material entire road length at sections as needed, for all affected areas on these three roads.
AvailableConstruction includes milling, asphalt overlay/repaving, leveling and striping on up to 1.3 miles of road. The work will approx. be 16375 SY of resurfacing around 1480 tons of asphalt. Paint and striping replacement.
Posted Date
Dec 29, 2025
Due Date
Feb 27, 2026
Release: Dec 29, 2025
Close: Feb 27, 2026
Construction includes milling, asphalt overlay/repaving, leveling and striping on up to 1.3 miles of road. The work will approx. be 16375 SY of resurfacing around 1480 tons of asphalt. Paint and striping replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →