Summary
The project includes the following work: Road repair and paving on Moran Circle. The Moran Circle work consists of existing pavement removal, and curb removal and replace as necessary, installation of 8â depth crusher run, installation of a 2â base course, tack coat, and 1-1/2â wear course, and traffic control throughout the project area. Add alternate road repair and paving on Ruby Drive. The Ruby Drive work consists of milling transition areas and worn areas, installation of a leveling course, tack coat, and 1-1/2â wearing course, and traffic control throughout the project area. The project has an expected duration of 30 calendar days.