Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for replacement and new installation of sidewalk, curb, gutter, and storm drain facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following approximate quantities of Work: 1,400 linear feet (LF) of 8 inch ductile iron water main; 35 1 inch water service and sanitary lateral replacements; 3 fire hydrants; 1,400 LF of 8 inch PVC sanitary sewer; 6 sanitary sewer manholes; 810 LF of concrete storm sewer pipe up to 15 inch diameter; 3 storm sewer manholes; 10 storm sewer inlets; 8,900 tons (T) of crushed stone base course; 2,800 LF of curb and gutter removal and replacement; 15,900 square feet of new and replacement concrete sidewalk and driveway; 1,500 T of asphalt pavement; 3 blocks of urban street seed restoration; erosion control and pavement markings; among other items.
Posted Date
Jan 9, 2026
Due Date
Jan 23, 2026
Release: Jan 9, 2026
Close: Jan 23, 2026
Project includes the following approximate quantities of Work: 1,400 linear feet (LF) of 8 inch ductile iron water main; 35 1 inch water service and sanitary lateral replacements; 3 fire hydrants; 1,400 LF of 8 inch PVC sanitary sewer; 6 sanitary sewer manholes; 810 LF of concrete storm sewer pipe up to 15 inch diameter; 3 storm sewer manholes; 10 storm sewer inlets; 8,900 tons (T) of crushed stone base course; 2,800 LF of curb and gutter removal and replacement; 15,900 square feet of new and replacement concrete sidewalk and driveway; 1,500 T of asphalt pavement; 3 blocks of urban street seed restoration; erosion control and pavement markings; among other items.
AvailableWork includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
Posted Date
Nov 20, 2025
Due Date
Jan 22, 2026
Release: Nov 20, 2025
Close: Jan 22, 2026
Work includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
AvailableWork consists of installation of new curb, gutter, sidewalk, and curb ramps; replacement and installation of storm drain, street lighting modifications, pavement rehabilitation, adjusting utilities within the paving and/or sidewalk limits, restoring traffic striping, legends, markings, modifying existing traffic signal backplates, and all other work.
Posted Date
Nov 19, 2025
Due Date
Feb 4, 2026
Release: Nov 19, 2025
Close: Feb 4, 2026
Work consists of installation of new curb, gutter, sidewalk, and curb ramps; replacement and installation of storm drain, street lighting modifications, pavement rehabilitation, adjusting utilities within the paving and/or sidewalk limits, restoring traffic striping, legends, markings, modifying existing traffic signal backplates, and all other work.
AvailableWork includes 2,514 SY aggregate subgrade improvement 12"; 19,315' longitudinal joint sealant; 323 SY hot-mix asphalt surface removal - butt joint; 53 SF portland cement concrete sidewalk 5"; 340 SY class d patches, type 1, 12"; 340 SY class d patches, type II, 12"; 2,518 SY hot-mix asphalt shoulders, 8"; 58' combination concrete curb and gutter, type B-6. 12; 108,260' temporary pavement marking - line 4"- paint; 150' storm sewers to be cleaned 12"; 100' combination curb and gutter removal and replacement less than or equal to 10'; 100' combination curb and gutter removal and replacement greater than 10'.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 2,514 SY aggregate subgrade improvement 12"; 19,315' longitudinal joint sealant; 323 SY hot-mix asphalt surface removal - butt joint; 53 SF portland cement concrete sidewalk 5"; 340 SY class d patches, type 1, 12"; 340 SY class d patches, type II, 12"; 2,518 SY hot-mix asphalt shoulders, 8"; 58' combination concrete curb and gutter, type B-6. 12; 108,260' temporary pavement marking - line 4"- paint; 150' storm sewers to be cleaned 12"; 100' combination curb and gutter removal and replacement less than or equal to 10'; 100' combination curb and gutter removal and replacement greater than 10'.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →