Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform penetration tests of its network, applications, and buildings over a two (2)-year period.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Network Security Penetration Test. The services are to include: Include all of GUC's networks: corporate network and each of the SCADA networks (Electric, Water, Wastewater, and Natural Gas), Number of external IPs: 22, Number of internal IPs (Endpoints) accounts: 510, Number of IT (non-SCADA) servers (Windows and Linux): 195, Time allowed for reconnaissance and OSINT: 10 hours.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Network Security Penetration Test. The services are to include: Include all of GUC's networks: corporate network and each of the SCADA networks (Electric, Water, Wastewater, and Natural Gas), Number of external IPs: 22, Number of internal IPs (Endpoints) accounts: 510, Number of IT (non-SCADA) servers (Windows and Linux): 195, Time allowed for reconnaissance and OSINT: 10 hours.
Premium
Access the largest public sector contact database
Work consists of relief wells inspection, testing and rehabilitation.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Work consists of relief wells inspection, testing and rehabilitation.
AvailableWork consists of relief wells inspection, testing and rehabilitation.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Work consists of relief wells inspection, testing and rehabilitation.
AvailableConduct water penetration testing in 12 (twelve) different locations in Stillwell Towers utilizing a combination of standards under ASTM E1105 and E2128. Additionally, the selected building diagnostic professional will conduct visual investigation of all PTAC locations in the building (a total of 233, among which 210 are in residential units), being expected to remove PTACs from their sleeves and record condition of sleeves, wooden platforms, baseboards and other adjacent structures. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 5, 2026
Release: Dec 10, 2025
Close: Jan 5, 2026
Conduct water penetration testing in 12 (twelve) different locations in Stillwell Towers utilizing a combination of standards under ASTM E1105 and E2128. Additionally, the selected building diagnostic professional will conduct visual investigation of all PTAC locations in the building (a total of 233, among which 210 are in residential units), being expected to remove PTACs from their sleeves and record condition of sleeves, wooden platforms, baseboards and other adjacent structures. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis