Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-Build: Work includes removal of stumps and general grading, installation of 18" RCP storm drain, including flared end sections and 2 storm boxes, 370 LF of curb and guttering, 1,067 SY of GABC at 4' depth, 305 TON of 12.5 MM paving 2' thick, 40 SY rip rap outlet protection, grassing and pavement marking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The FY2026G Storm Water Repair and Improvement project is an invitation to bid for enhancing storm water infrastructure within the city limits of Charlotte, NC. The scope of work includes mobilization, earthwork, installation of drainage structures, storm drain pipe systems, channels, and asphalt paving. The project has an estimated value of approximately $5.4 million and is managed by Charlotte Water.
Posted Date
Jan 30, 2026
Due Date
Feb 24, 2026
Release: Jan 30, 2026
Close: Feb 24, 2026
The FY2026G Storm Water Repair and Improvement project is an invitation to bid for enhancing storm water infrastructure within the city limits of Charlotte, NC. The scope of work includes mobilization, earthwork, installation of drainage structures, storm drain pipe systems, channels, and asphalt paving. The project has an estimated value of approximately $5.4 million and is managed by Charlotte Water.
AvailableBrazoria County Municipal Utility District No. 57 is soliciting bids to construct water, wastewater, storm sewer, and paving improvements to serve Meridiana Section Sixteen in Brazoria County, Texas. The work includes approximately 1,835 LF of 8‑inch PVC waterline, 1,265 LF of 8‑inch PVC sanitary sewer, 1,512 LF of 24‑ to 60‑inch HDPE storm sewer, and 7,270 SY of 6‑inch concrete paving. A non‑mandatory pre‑bid will be held via Zoom on February 3, 2026, and bids are due at 2:00 PM CST on February 10, 2026.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Brazoria County Municipal Utility District No. 57 is soliciting bids to construct water, wastewater, storm sewer, and paving improvements to serve Meridiana Section Sixteen in Brazoria County, Texas. The work includes approximately 1,835 LF of 8‑inch PVC waterline, 1,265 LF of 8‑inch PVC sanitary sewer, 1,512 LF of 24‑ to 60‑inch HDPE storm sewer, and 7,270 SY of 6‑inch concrete paving. A non‑mandatory pre‑bid will be held via Zoom on February 3, 2026, and bids are due at 2:00 PM CST on February 10, 2026.
Project consists of 240 LF excavation of subgrade; 200 CY pavement repair; 46,693 SY 2 1/4" pavement planing, asphalt concrete; 12,963 SY 3" pavement planing, asphalt concrete; 2550 SY patching planed surface; 7,342 GAL non-tracking tack coat; 2,079 CY asphalt concrete, surface course; 631 CY asphalt concrete, intermediate course; 160 SY 6" non-reinforced concrete pavement, class ms; 510 LF curb, type 6; 1,500 SY special-misc.: glasgrid; 309 SY stop line.
Posted Date
Jan 23, 2026
Due Date
Feb 13, 2026
Release: Jan 23, 2026
Close: Feb 13, 2026
Project consists of 240 LF excavation of subgrade; 200 CY pavement repair; 46,693 SY 2 1/4" pavement planing, asphalt concrete; 12,963 SY 3" pavement planing, asphalt concrete; 2550 SY patching planed surface; 7,342 GAL non-tracking tack coat; 2,079 CY asphalt concrete, surface course; 631 CY asphalt concrete, intermediate course; 160 SY 6" non-reinforced concrete pavement, class ms; 510 LF curb, type 6; 1,500 SY special-misc.: glasgrid; 309 SY stop line.
The Elmhurst Park District is soliciting sealed bids for the 2026 Paving Improvements project, which includes demolition and replacement of existing asphalt pathways and installation of new asphalt pathways at multiple Park District locations in Elmhurst, Illinois. A mandatory pre‑bid meeting will be held on February 9, 2026 at 10:00 a.m. at the Park District Maintenance Facility. Sealed bids are due by 10:30 a.m. on February 24, 2026 at the Park District Administrative Office.
Posted Date
-
Due Date
Feb 24, 2026
Release: -
Close: Feb 24, 2026
The Elmhurst Park District is soliciting sealed bids for the 2026 Paving Improvements project, which includes demolition and replacement of existing asphalt pathways and installation of new asphalt pathways at multiple Park District locations in Elmhurst, Illinois. A mandatory pre‑bid meeting will be held on February 9, 2026 at 10:00 a.m. at the Park District Maintenance Facility. Sealed bids are due by 10:30 a.m. on February 24, 2026 at the Park District Administrative Office.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis