Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The improvement includes construction of portland cement concrete (pcc) sidewalk, pcc ada-compliant curb ramps, grading, pavement removal, subdrain, storm sewer, modular block retaining walls, water service modifications, surface restoration, traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Hazardous sidewalk replacement program ne quadrant 2026 pahse 3.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
Close: Dec 16, 2025
Hazardous sidewalk replacement program ne quadrant 2026 pahse 3.
AvailablePremium
Access the largest public sector contact database
Construction of approx., 2,200 SF 4" and 6" sidewalk replacements along with concrete street panel replacements.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Construction of approx., 2,200 SF 4" and 6" sidewalk replacements along with concrete street panel replacements.
AvailableThe City of Louisville is soliciting bids for the Chickasaw Neighborhood Sidewalk Repairs to replace sidewalks and entrances across approximately 10 residential blocks near the Shawnee Library. This IFB requires a bid bond of not less than 5% of the total bid and includes engineer plans and specifications available via the Bonfire posting (download requires a Bonfire account).
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The City of Louisville is soliciting bids for the Chickasaw Neighborhood Sidewalk Repairs to replace sidewalks and entrances across approximately 10 residential blocks near the Shawnee Library. This IFB requires a bid bond of not less than 5% of the total bid and includes engineer plans and specifications available via the Bonfire posting (download requires a Bonfire account).
AvailableSealed bids for 2026 Sidewalk Maintenance: turnkey sidewalk, curb, gutter, brick paver, colored concrete, asphalt, drainage and site restoration repairs per measured-quantity bid schedule. Bidders must provide a 5% bid bond and perform work to City Engineer plans/specifications; public bid opening and City Council reserves right to reject bids.
Posted Date
Nov 26, 2025
Due Date
Dec 12, 2025
Release: Nov 26, 2025
Close: Dec 12, 2025
Sealed bids for 2026 Sidewalk Maintenance: turnkey sidewalk, curb, gutter, brick paver, colored concrete, asphalt, drainage and site restoration repairs per measured-quantity bid schedule. Bidders must provide a 5% bid bond and perform work to City Engineer plans/specifications; public bid opening and City Council reserves right to reject bids.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis