Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Louisville is soliciting bids for the Chickasaw Neighborhood Sidewalk Repairs to replace sidewalks and entrances across approximately 10 residential blocks near the Shawnee Library. This IFB requires a bid bond of not less than 5% of the total bid and includes engineer plans and specifications available via the Bonfire posting (download requires a Bonfire account).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include include replacement of sidewalks and entrances on approx 10 residential blocks.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work include include replacement of sidewalks and entrances on approx 10 residential blocks.
AvailablePremium
Access the largest public sector contact database
Work include include replacement of sidewalks and entrances on approx 10 residential blocks.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Work include include replacement of sidewalks and entrances on approx 10 residential blocks.
AvailableThe improvement includes construction of portland cement concrete (pcc) sidewalk, pcc ada-compliant curb ramps, grading, pavement removal, subdrain, storm sewer, modular block retaining walls, water service modifications, surface restoration, traffic control.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Release: Dec 9, 2025
Close: Dec 23, 2025
The improvement includes construction of portland cement concrete (pcc) sidewalk, pcc ada-compliant curb ramps, grading, pavement removal, subdrain, storm sewer, modular block retaining walls, water service modifications, surface restoration, traffic control.
AvailableWork consists of 4,471 SF of remove and replace 4" PCC sidewalk, 113 SF of remove and replace 6" PCC sidewalk, 48 LF of remove and replace pcc curb and gutter.
Posted Date
Dec 1, 2025
Due Date
Dec 24, 2025
Release: Dec 1, 2025
Close: Dec 24, 2025
Work consists of 4,471 SF of remove and replace 4" PCC sidewalk, 113 SF of remove and replace 6" PCC sidewalk, 48 LF of remove and replace pcc curb and gutter.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis