Summary
The Project consists of, but is not limited to the following major elements: Approx. 480 TNs of 9.5 MM asphalt superpave, 286 TNs of asphalt patching, 4,300 SY of 12" soil-cement stabilization (CSRB), 430 SY of 6" graded aggregate base course, 98 CY of Class B concrete base and pavement widening, 120 CY of foundational backfill material, 340 LF of header curb, 30 LF of 24" RCP storm drain, 524 LF of 18" RCP storm drain, 35 LF of 15" RCP storm drain, 30 drainage structures, 3,200 LF of 5" white thermoplastic pavement striping, 10,200 LF of 5" yellow thermoplastic pavement striping, 60 LF of 24" thermoplastic pavement striping, signage, adjusting structures to grade, shoulder reconstruction, traffic and erosion control measures.