Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work to be performed shall include furnishing all labor, services, insurance, meet safety requirements, backfill, asphalt, grout, concrete, flowable fill, equipment, public notification, and traffic control to install sanitary sewers and manholes in a public residential street, and conduct mandrel testing on the finished lines. The work will consist of installing an estimated 380 LF of 8-IN SDR-35 sewer pipe, installing one new manhole structure, and coring into an existing manhole.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
Close: Feb 12, 2026
2026 sanitary sewer rehabilitation. Construct 2026 Sanitary Sewer Rehabilitation project including all labor, materials, and equipment necessary to construct approx. 2,438 LF of Cured in Place Pipe (CIPP) sewer main lining, pre and post internal video inspection, prerehabilitation cleaning, root cutting, protruding service removal, service reinstatement, pressure testing of service connections, injection grouting of service connections, mobilization, traffic control and miscellaneous work, including cleanup.
AvailableThe City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
Posted Date
Jan 23, 2026
Due Date
Feb 11, 2026
Release: Jan 23, 2026
Close: Feb 11, 2026
The City of Euless issued a solicitation for the FY 2026 Sanitary Sewer Replacement project to rehabilitate and replace approximately 2,591 linear feet of sanitary sewer using trenchless technology and new HDPE piping. The project includes the removal and installation of manholes, cleanouts, and CCTV inspection with an estimated value range of $500,000 to $1,500,000. Bids are due by February 11, 2026, for a contract period of 120 calendar days following the notice to proceed.
Work include sanitary sewer repair.
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Work include sanitary sewer repair.
AvailableReplacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 19, 2026
Release: Jan 14, 2026
Close: Feb 19, 2026
Replacing-in-place approx. 1900 LF of 18", and 775 LF of 20" PVC pipe sanitary sewer main. The installation of 1150 LF of 8" PVC pipe sanitary sewer main; including 15 manhole structures, by-pass pumping system and all other necessary and required appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis