Summary
The Town of Dillon, Colorado is soliciting bids for the construction of a new parking lot located at 700 E. Anemone Trail in Dillon. The work includes installation of concrete valley pans, sidewalks, asphalt paving, colored concrete slope paving, a storm sewer inlet, a storm trench drain, associated removal/replacement of concrete and asphalt within Little Dam Street, minor grading to subgrade, and haul-off of excess materials. A mandatory pre-bid meeting is scheduled for June 29, 2026 at 1:00 PM, with bid questions due by July 6, 2026 at 1:00 PM, and sealed bids due by July 10, 2026 at 1:00 PM MDT; bonds are required.