CityME
Posted
Sep 14, 2026
Oct 8, 2026
Old Mill Road Slope Stabilization 2026 RFP
Work includes 600 SY removing existing bituminous pavement, 2200 CY excavation/grading of embankment, 200 CY aggregate subbase course - type d, 50 ton 12. 5 mm hma pavement, 180 LF bituminous curb, 180 LF 31" w-beam guardrail, 2 EA 31" w-beam guardrail flared terminal, 1 EA adjusting catch basin to grade, 150 SY turf reinforced mat, erosion control. See attached file.
