Summary
Work includes 1,404 SY rotomilling; 493 SY pavement, driveway and sidewalk removal; 50 LF water service lines, remove & replace; 535 LF 15" storm pipe; 183 LF 18" storm pipe; 200 ton pipe foundation stabilization; 5 EA alley intakes, new; 29 LF trench drain, new; 902 LF perforated drain tile, 4"; 17 LF solid wall drain tile, 6"; 1,605 SY subgrade treatment, engineering fabric; 450 ton granular stabilization material (6"); 1,605 SY granular subbase, grad 14 (12"); 493 sy granular subbase, grad 14 (6"); 100 SY granular surfacing, 6"; 152 TON hma standard traffic (st) s-i, 3/8", pg 58-28h; 228 ton hma standard traffic (st) base, 3/4", pg 58-28s. See outside link.