Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Contract provides for but is not limited to the installation of ADA compliant ramps at the intersections. Work includes traffic control, removal of existing curb/curb & gutter and sidewalk at corner, construction of ADA ramps, and restoration of existing adjacent landscaping and irrigation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This Contract provides for but is not limited to the installation of ADA compliant ramps at the intersections. Work includes traffic control, removal of existing curb/curb & gutter and sidewalk at corner, construction of ADA ramps, and restoration of existing adjacent landscaping and irrigation.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
This Contract provides for but is not limited to the installation of ADA compliant ramps at the intersections. Work includes traffic control, removal of existing curb/curb & gutter and sidewalk at corner, construction of ADA ramps, and restoration of existing adjacent landscaping and irrigation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Washington Department of Natural Resources is seeking to lease approximately 3,572 BOMA rentable square feet of office space, vehicle storage, and dorm space in the Walla Walla area for an initial 5-year term (minimum 5 years, maximum 10 years). The lease will use State-approved lease documents, require prevailing wages for workers, and the space should meet the RES definition of Existing Space and include the infrastructure and storage described in the solicitation.
Posted Date
Oct 14, 2025
Due Date
Oct 14, 2027
Release: Oct 14, 2025
Close: Oct 14, 2027
The State of Washington Department of Natural Resources is seeking to lease approximately 3,572 BOMA rentable square feet of office space, vehicle storage, and dorm space in the Walla Walla area for an initial 5-year term (minimum 5 years, maximum 10 years). The lease will use State-approved lease documents, require prevailing wages for workers, and the space should meet the RES definition of Existing Space and include the infrastructure and storage described in the solicitation.
AvailableWalla Walla Community College (WWCC) is soliciting bids for replacement of motor control centers (MCCs) in Building D, with a base bid for MCC-B4 and four additive alternates for MCCs B1, B2, B3 and B5. The procurement is an RFB (lump-sum single-prime contract) administered by the Washington State Department of Enterprise Services (DES) with a pre-bid walkthrough scheduled for Jan 20, 2026 and bidder questions due Jan 26, 2026. Sealed bids are due Feb 5, 2026 at 1:00 PM PST and the project includes schedule, bonding, prevailing wage, and diverse business participation requirements.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Walla Walla Community College (WWCC) is soliciting bids for replacement of motor control centers (MCCs) in Building D, with a base bid for MCC-B4 and four additive alternates for MCCs B1, B2, B3 and B5. The procurement is an RFB (lump-sum single-prime contract) administered by the Washington State Department of Enterprise Services (DES) with a pre-bid walkthrough scheduled for Jan 20, 2026 and bidder questions due Jan 26, 2026. Sealed bids are due Feb 5, 2026 at 1:00 PM PST and the project includes schedule, bonding, prevailing wage, and diverse business participation requirements.
AvailableProvide courier services.
Posted Date
Jan 14, 2026
Due Date
Jan 28, 2026
Release: Jan 14, 2026
Close: Jan 28, 2026
Provide courier services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →