Description: Improvements to the existing Effluent Tertiary Filters including removal and replacement of the filter media, replacement of filter nozzle assemblies, coating of the inner cell tank walls, removal and replacement of backwash waste butterfly valves, replacement of pneumatic valve control airlines, removal and replacement of cell isolation butterfly valves, installation of a grated stainless-steel platform in the filter center column, and other miscellaneous work. Replacement of the existing Bar Screen including removal and replacement of the bar screen, disconnecting power and control wiring from the existing screen and reconnecting to the new screen, and fabrication and installation of a screenings chute to connect to the new Bar Screen to the existing Screenings Washer Compactor. An alternate bid to also include replacement of the existing Screenings Washer Compactor with a new piece of equipment is also to be provided. Improvements to the existing Aeration Basin including replacement of the existing chain driven assemblies and motors with new right-angle gearbox drives and motors, removal of existing soft motor starters, installation of variable frequency motor controllers, integration of SCADA controls, new conduit and wiring, and other miscellaneous work. Improvements to the existing Backwash Holding Tank including reinforcing steel and concrete repairs, minor demolition, removal and replacement of handrails, coating of the tank concrete walls, and other miscellaneous work. Preparation and coating of walls, ceilings, floors, piping, and equipment in the Grit Room and Filter Room and other miscellaneous surfaces. Installation of a bypass pumping connection in the existing buried heavy sludge pipeline from Final Clarifier No. 2 to the Main Building and other miscellaneous site work. All other civil, mechanical, structural, electrical, and instrumentation and control work necessary for a complete and functioning project as shown or specified.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Village of Sussex.
These related opportunities are still open for bidding.
CityGA
Aug 10, 2026
Closes
Sep 17, 2026
The City of Social Circle, Georgia is seeking contractors for significant upgrades to its Little River Water Pollution Control Plant and sewerage system. Contract 1 covers approximately 3,600 linear feet of DIP and PVC sewer with manholes, jack-and-bore work, rock excavation, clearing, and erosion and sediment controls, while Contract 2 covers new treatment-process and support facilities including aeration basins, clarifiers, tertiary filters, ultraviolet disinfection, pumping, chemical feed, control, digestion, and sludge-dewatering facilities. The Georgia Procurement Registry identifies this as a construction/public-works procurement rather than a grant, requiring a State of Georgia Utility Contractor License and a state Utility Manager certificate holder, with listed completion periods of 270, 480, and 540 days.
CityGA
Aug 10, 2026
Closes
Sep 17, 2026
The City of Social Circle, Georgia is seeking contractors for significant upgrades to its Little River Water Pollution Control Plant and sewerage system. Contract 1 covers approximately 3,600 linear feet of DIP and PVC sewer with manholes, jack-and-bore work, rock excavation, clearing, and erosion and sediment controls, while Contract 2 covers new treatment-process and support facilities including aeration basins, clarifiers, tertiary filters, ultraviolet disinfection, pumping, chemical feed, control, digestion, and sludge-dewatering facilities. The Georgia Procurement Registry identifies this as a construction/public-works procurement rather than a grant, requiring a State of Georgia Utility Contractor License and a state Utility Manager certificate holder, with listed completion periods of 270, 480, and 540 days.
CityWI
Aug 11, 2026
Closes
Sep 2, 2026
Project involves upgrading of the aeration system which includes but is not limited to replacement of aeration equipment, refurbishment of aerator weather hoods, and cleaning of oxidation ditch channels.
CountyFL
Jun 11, 2026
Closes
Aug 25, 2026
Water reclamation facility SCADA upgrades with fiber and control room and PLC replacements, SCADA and operational. Scope of this project is to replace and upgrade the Eastern Water Reclamation Facility PLC (Programmable Logic Controller) along with upgrading the existing WinCC SCADA (Supervisory Control and Data Acquisition) system, and make improvements to the control and computer room including a humidity control system (HVAC) which will require reconfiguration and reconnection of the existing water plumbing. See attached file.