Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Improvements to the existing Effluent Tertiary Filters including removal and replacement of the filter media, replacement of filter nozzle assemblies, coating of the inner cell tank walls, removal and replacement of backwash waste butterfly valves, replacement of pneumatic valve control airlines, removal and replacement of cell isolation butterfly valves, installation of a grated stainless-steel platform in the filter center column, and other miscellaneous work. Replacement of the existing Bar Screen including removal and replacement of the bar screen, disconnecting power and control wiring from the existing screen and reconnecting to the new screen, and fabrication and installation of a screenings chute to connect to the new Bar Screen to the existing Screenings Washer Compactor. An alternate bid to also include replacement of the existing Screenings Washer Compactor with a new piece of equipment is also to be provided. Improvements to the existing Aeration Basin including replacement of the existing chain driven assemblies and motors with new right-angle gearbox drives and motors, removal of existing soft motor starters, installation of variable frequency motor controllers, integration of SCADA controls, new conduit and wiring, and other miscellaneous work. Improvements to the existing Backwash Holding Tank including reinforcing steel and concrete repairs, minor demolition, removal and replacement of handrails, coating of the tank concrete walls, and other miscellaneous work. Preparation and coating of walls, ceilings, floors, piping, and equipment in the Grit Room and Filter Room and other miscellaneous surfaces. Installation of a bypass pumping connection in the existing buried heavy sludge pipeline from Final Clarifier No. 2 to the Main Building and other miscellaneous site work. All other civil, mechanical, structural, electrical, and instrumentation and control work necessary for a complete and functioning project as shown or specified.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
Posted Date
Nov 26, 2025
Due Date
Dec 31, 2025
Release: Nov 26, 2025
Close: Dec 31, 2025
Upgrades To the Pump and Water Treatment Facility. PLC & SCADA System Upgrade Project.
AvailablePurchase of various chemicals for the Yorktown Water Pollution Control Plant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Purchase of various chemicals for the Yorktown Water Pollution Control Plant.
AvailableAll work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
Posted Date
Oct 3, 2025
Due Date
Jan 6, 2026
Release: Oct 3, 2025
Close: Jan 6, 2026
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
AvailableThe Massachusetts Water Resources Authority (MWRA) seeks bids for Contract No. 8021 to upgrade the sodium hypochlorite chemical feed systems at the Brutsch Water Treatment Facility in Ware, MA, including replacement of bulk storage tanks, CPVC piping, metering pumps, control panels and a containment liner. Electronic submission through the Commbuys/MWRA supplier portal is required; general bids are due 2026-01-28 at 2:00 PM (local time) and a mandatory pre-bid/site visit is scheduled for 2025-12-12 at 10:00 AM.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
The Massachusetts Water Resources Authority (MWRA) seeks bids for Contract No. 8021 to upgrade the sodium hypochlorite chemical feed systems at the Brutsch Water Treatment Facility in Ware, MA, including replacement of bulk storage tanks, CPVC piping, metering pumps, control panels and a containment liner. Electronic submission through the Commbuys/MWRA supplier portal is required; general bids are due 2026-01-28 at 2:00 PM (local time) and a mandatory pre-bid/site visit is scheduled for 2025-12-12 at 10:00 AM.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis