Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide water main replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Approx., 1,600 LF of 8" ductile iron water main replacement and about 75 LF of 10" HDPE water main boring. Additionally, service reconnections, hydrant installation, surfacing repair, and related work.
AvailablePremium
Access the largest public sector contact database
Project includes approx. 20,807 LF of 8" C900 PVC and fittings, Complete in Place; 45 EA Fire Hydrant Assembly; 18,817 SY of 6" Asphalt Removal and Patching; 462 EA of Water Service Tap Reconnection; 1,890 LF of 12" C900 PVC and fittings, Complete in Place; 2 EA of Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place and 101 of SY Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in Place.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Project includes approx. 20,807 LF of 8" C900 PVC and fittings, Complete in Place; 45 EA Fire Hydrant Assembly; 18,817 SY of 6" Asphalt Removal and Patching; 462 EA of Water Service Tap Reconnection; 1,890 LF of 12" C900 PVC and fittings, Complete in Place; 2 EA of Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place and 101 of SY Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in Place.
AvailableProcurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
Posted Date
Dec 13, 2025
Due Date
Jan 14, 2026
Release: Dec 13, 2025
Close: Jan 14, 2026
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
AvailableWork includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Work includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis